LARS FOR MULTIMISSION SPACE

  IN INDUSTRIAS FERRI  HAVE DEVELOPED A LOAD HANDLING SYSTEM IN MULTIMISSION SPACES DESIGNED FOR THE NEW SPANISH FRIGATES OF THE F110 PROGRAM IN ACCORDANCE WITH THOSE REQUESTED BY THE SPANISH NAVY In accordance with the requirements of the Spanish Navy, this...

Industrias Ferri permanecerá cerrada los días 3 y 4 de Marzo

Industrias Ferri will be closed on March 3rd and 4th

Industrias Ferri sera fermé les 3 et 4 mars

Industrias Ferri is gesloten op 3 en 4 maart