IN INDUSTRIAS FERRI HAVE DEVELOPED A LOAD HANDLING SYSTEM IN MULTIMISSION SPACES DESIGNED FOR THE NEW SPANISH FRIGATES OF THE F110 PROGRAM IN ACCORDANCE WITH THOSE REQUESTED BY THE SPANISH NAVY
In accordance with the requirements of the Spanish Navy, this system must be capable of loading cargo from land with sizes such as a 40 foot container (limited in weight to 15 tons) or a vessel up to 12 meters in length. In some Sometimes the loads to be shipped are delicate and their handling must consider this aspect.
Likewise, you must move loads within the space in such a way that the capacity of the space to accommodate the greater number of components and move the loads towards the flight deck so that they can be loaded or transported via helicopter or unloaded from the deck itself with means other than the ship itself.
Finally, it will have to put in the water and recover certain loads that require it, such as boats or both surface and unmanned submarine vehicles.
Please click in the link to read more infodefensa.com