Launch and recovery systems

 

Any and every LARS to be adapted to the location and working conditions of the boat.

 

We design and build launch and recovery systems for the most demanding situations, basing our work on the functions to be complied with in order to attain maximum operativeness, productivity and safety of the equipment. Our enormous experience has allowed us to innovate in the design of LARS equipment, affording our clients improvements in their operations and keeping their equipment working in sea state 6 or more.

This is synonymous with greater work efficiency and greater productivity. We develop any LARS system: A-frames, telescopic and/or articulated arms, cranes, davits, etc. For all types of submersible and surface craft: ROVs, CTD Rosettes, torpedoes, sonars, plows, piston corers, submarines. Installed on different types of vessels: seismographic survey ships, mega-yachts, military and naval vessels, cable ships, oceanographic vessels, offshore submarine rescue craft, hydrographic vessels, etc.

They have trusted us:

                

During our operations, it is not allowed to fail. Solutions require inventiveness and technology as well as actions that bring results, which is why we need to have collaborators such as Ferri close at hand.

Ulpiano González

Project Manager, ACSM

MULTISERVICE LARS IN BELOW DECK HANGAR

Pegaso (Malta)
Oceanographic-explorer vessel

FUNCTION: A transversal crane for the launching and recovery of workboats and a crewed minisubmarine.

CONTRIBUTION: Equipment designed for launching and recovery on either side of the vessel for items up to 14t. The key factor was to design a made-to-measure unit for the vessel and the minisubmarine, with minimal interior height in the hangar, while complying with demands of finishing as required by a megayacht.

OTHER FERRI EQUIPMENT INSTALLED: Cradles for the workboats and submarine.

TELESCOPIC BOOM FOR CTD ROSETTE

Sarmiento de Gamboa (Spain)
Oceanographic vessel

FUNCTION: Telescopic boom for launch and recovery of CTD rosette.

CONTRIBUTION: Transfer system, to place equipment near the waterline. Certified by Bureau Veritas.

OTHER FERRI EQUIPMENT INSTALLED: Stern A-FRAME for ROV. Hydrographic lateral A-FRAME for core drills. Articulated armsand other auxiliary equipment for seismic operations.

ROV LARS

Ángeles Alvariño & Ramón Margalef (Spain)
Oceanographic vessel

FUNCTION: Equipment for launch and recovery of an ROV, Liropus class.

CONTRIBUTION: An auxiliary winch, oceanographic bar and shock-absorbing docking-head for ROV operation. Wide swing angle via a system of connecting rods. Auxiliary snatch-blocks for fishing ops. Certified by Bureau Veritas.

OTHER FERRI EQUIPMENT INSTALLED: Articulated electro-hydraulic crane of 5t at 9m in sea conditions up to Beaufort 2. Telescopic boom. Side A-FRAME. Stern A-FRAME. Boat davit.

ELECTRO-HYDRAULIC ARTICULATED OFFSHORE CRANE FOR ROV

Odiseey explorer & Explorer/coastal connector (USA). Cablership/raymond Croze (FRA). Cablership/Teneo, Cablership/Iberus & Multipurpose vessel (ESP). Cableship/Havila reel (VIN).

More information

FUNCTION: Equipment for launch and recovery of a Nereus class ROV in OCEANGOING conditions.

CONTRIBUTION: It has a stabilizing docking-head for ROVs. Design complies with Lloyd´s and Bureau Veritas CODE FOR LIFTING APPLIANCES. The crane is interchangeable between vessels.

OTHER FERRI EQUIPMENT INSTALLED: Boat davit. Crane for cargo and rafts. Bridgecrane situated forward. Bow crane.

STERN A-FRAME FOR ROV

Sarmiento de Gamboa (Spain)
Oceanographic vessel

FUNCTION: Equipment for launch and recovery of ROV.

CONTRIBUTION: Equipment specially designed for handling an ROV at sea. The A-FRAME operates in coordination with the different winches on board and one incorporated in the structure specially designed to support the ROV´s maneuvers. ALS classified by BV.

OTHER FERRI EQUIPMENT INSTALLED: A telescopic boom for CTD rosette. Hydrographic lateral A-FRAME for core drills. Articulated arms and other auxiliary equipment for seismic operations.

STERN A-FRAME FOR LAUNCH AND RECOVERY OF A FISHING BOAT

Intermares (Spain)
Navigation-and-fishery school vessel

Function: A-FRAME for launching and recovery of a fishing boat.

CONTRIBUTION: Equipment designed for launching and recovery of a fishing boat of up to 45t. Raising with hydraulic cylinder. Certified by Bureau Veritas.

OTHER FERRI EQUIPMENT INSTALLED: Articulated crane, boat davits and gangway.

A-FRAME FOR RECOVERY OF SHIPWRECKAGE AND OTHER DRIFTING OBJECTS

Clara Campoamor & Don Inda (Spain)
Tug boats

FUNCTION: A-FRAME for recovery of ship wreckage and other drifting objects.

CONTRIBUTION: Equipment designed for the recovery of wreckage and other large objects up to 100t weight, 11.7m long, and 8m high. This equipment has been designed so that it is interchangeable between twin vessels. Incorporating a raising winch. Design approved by DNV and construction approved by BV.

OTHER FERRI EQUIPMENT INSTALLED: Tow hook. Guide rollers with tow fork.

STERN A-FRAME WITH STABILIZER

Iberus (Spain)
Cableship

FUNCTION: A-FRAME for launch and recovery of a plough for burial of fiber optic cable to a depth of 1500m.

CONTRIBUTION: Equipment for handling a 25t plough at sea, stabilizer docking-head and wide angle of swing to free the tension of the winch while towing. Travelling docking-head on crossbar to catch the plough and stow it out of the line of the cable laying. Certified by LRS.

OTHER FERRI EQUIPMENT INSTALLED: Stern guide rollers for the plough towing cable and o shore crane for ROV handling.

STERN A-FRAME

Janan (Qatar)
Oceanographic-explorer vessel

More information

FUNCTION: Launch and recovery of oceanographic research equipment.

CONTRIBUTION: Wide swing angle via system of connecting rods. Auxiliary blocks for fishing operations.

OTHER FERRI EQUIPMENT INSTALLED: 2 side A-FRAMES.

STERN A-FRAME

Ocean researcher V (Taiwan)
Oceanographic-explorer vessel

More information

FUNCTION: Launch and recovery  of oceanographic research equipment.

CONTRIBUTION: Large diameter sheave for the use of umbilical signal cable. Largescale structures to operate large scale ROVs.

OTHER FERRI EQUIPMENT INSTALLED: Telescopic boom. Side A-FRAME. Slewing fairlead for outgoing of wire to each A-Frame.

STABILIZING DOCKING-HEAD

Discovery (UK)
Oceanographic vessel

More information

FUNCTION: Auxiliary equipment for launch and recovery of an ISIS robot submarine.

CONTRIBUTION: Integration with existing equipment. Modular design for ease of stowage. Damping and rotation capabilities.

OTHER FERRI EQUIPMENT INSTALLED: Main articulated crane. Container movement system. Monorail cranes.

NOS VEMOS EN:

MEET US AT THE EXHIBITION:
RENCONTREZ-NOUS À L’EXPOSITION:
ONTMOET ONS OP DE TENTOONSTELLING:
TREFFEN SIE UNS AUF DER MESSE:

STAND C01

Del 21 al 23 de Mayo de 2024 se celebrará en Vigo NAVALIA ...